Black & White FacilitiesBuilt around your estateDiscuss requirements

Services

Fire and Life Safety

This family includes assessments and management, alarms, doors and compartmentation, smoke control, extinguishers and fixed water-based installations. Each has a different role; the fire strategy and premises use guide the work.

Discuss your requirements

Defined services, clearly scoped.

Individual services

  • Dry and Wet Riser Testing — Riser testing checks the water-delivery installation intended for firefighting, with the test method matched to a dry or wet system.
  • Evacuation Safety — Evacuation-safety work examines how people leave or reach safety under the building's agreed emergency arrangements.
  • Fire Alarm Systems — Scope alarm installation, testing, maintenance and fault investigation.
  • Fire Compartmentation Surveys — A fire-compartmentation survey examines the walls, floors and junctions intended to limit the spread of fire and smoke.
  • Fire Curtains and Fire Shutters — Fire-curtain and fire-shutter work addresses protective assemblies that deploy to close an opening or separate an area during a fire.
  • Fire Damper Testing and Maintenance — Fire-damper testing and maintenance checks devices within ventilation routes that are intended to restrict fire spread.
  • Fire Doors — Inspect and address the condition of the complete doorset and its intended function.
  • Fire Extinguishers — Fire-extinguisher work covers selection, positioning, servicing and replacement of portable firefighting equipment for the premises.
  • Fire Risk Assessments — Assess fire risks, existing precautions and the actions needed for the premises.
  • Fire-Safety Compliance Audits — A fire-safety compliance audit compares defined arrangements and evidence with the fire-safety requirements relevant to the premises.
  • Fire-Safety Management — Fire-safety management organises the recurring actions, responsibilities and records needed to keep a building's fire arrangements under control.
  • Fire Stopping and Compartmentation — Address openings and junctions within the building’s fire-resisting construction.
  • Passive Fire Surveys — A passive-fire survey investigates the condition and arrangement of building elements intended to resist fire spread.
  • Smoke Control and AOV — Smoke-control and automatic opening vent work examines the equipment and controls used by a building's designed smoke-management arrangement.
  • Sprinklers, Risers and Hydrants — Sprinkler, riser and hydrant work concerns the fixed water-based installations supporting fire protection and firefighting.

Which service do you need?

Start with the known finding. An assessment reviews risk; a survey investigates particular building elements; testing checks a defined system; remedial work addresses identified defects. If the issue spans several measures, provide the assessment and relevant plans so the interfaces can be considered together.

Repairs, maintenance and projects

An immediate fault, recurring maintenance requirement and planned change need different instructions. Retain the original findings when moving between them so the work answers the actual issue. Explore maintenance for ongoing arrangements and projects for coordinated change.

For estates, relate local findings to the wider asset and investment plan without losing the priority of an individual defect.

Planning the work

Plan testing and temporary impairment of protective systems with the responsible person. Agree occupant communication, alternative arrangements, isolation and restoration. Concealed construction, roof access and occupied rooms may require separate access planning. Provide site contacts, operating constraints and the reporting format needed to connect the results to your existing records.

Work across sectors

Sleeping accommodation raises different evacuation and access considerations from daytime offices. Education premises need work arranged around children and staff; warehouses need attention to storage and changes in layout. The actual use and fire arrangements govern the scope. Explore all sectors; the examples here do not limit the wider recorded offering.

Frequently asked questions

Can I enquire without knowing which service I need?

Yes. Describe the issue, affected system or area and the result you need. An existing report or fault history can help establish whether assessment, maintenance or remedial work is the right starting point.

Can an inspection and the resulting repairs be organised together?

They can be coordinated, but keep the inspection findings, proposed repair and authorisation clear. Some work needs specialist examination or separate verification, so do not assume a single visit covers every stage.

What changes the cost?

The system or building type, extent of work, access and condition determine the scope. Missing records, concealed conditions, temporary arrangements and operational restrictions can add investigation or coordination requirements.

What information will help with an enquiry?

Provide the address, relevant asset or area, symptoms or planned changes, previous reports and access constraints. Include asset references and priorities across the sites.

Make an enquiry

Send Black & White Facilities the site or asset list, available findings and operational priorities. Define the reporting and responsibility interfaces alongside the technical scope. Discuss your requirement.

Service directory

Your next step

Bring the estate
into clearer view.

Contact Black & White Facilities