service page
Smoke Control and AOV
Fault indications, vents that fail to operate, water ingress or alterations to stairs and lobbies can prompt investigation. Describe when the issue started and any change in use, operation or layout. A clear history helps distinguish a new fault from an existing limitation or a planned improvement.
Discuss your requirementsDefined services, clearly scoped.
Overview
For an estate instruction, list affected sites separately. One recurring symptom can have different causes on different installations, so retain the local history and restrictions.
What the work can include
Identify the system; inspect vents, actuators and controls; check agreed alarm and power interfaces; investigate faults; record functional results. The agreed scope should state which areas or equipment are included, what is excluded and the form of the completion record.
Use asset or location references that can be matched to your existing records. This makes the findings useful for budget decisions, repeat work and subsequent inspections.
Important decisions
An AOV is one element of a designed system. Changing an actuator, vent size or control sequence can affect the intended smoke-control function.
Assessment and preparation
Supply the fire strategy, system drawings, cause-and-effect information, manuals and fault history.
Name the site contact, technical approver and person who will receive the action list. Identify permit, shutdown and contractor coordination requirements before arranging attendance.
How the work proceeds
Plan tests with the building contact, control roof or high-level access, check the specified functions and record the restored state.
Where the work forms part of a wider programme, agree the order of sites and the route for escalating material findings. Keep partial completion visible rather than closing a whole site while actions remain open.
Cost, timing and disruption
Natural or mechanical design, access height, control complexity, parts and occupied-area restrictions affect scope. The enquiry and available records establish what can be priced directly and what needs a site assessment first.
A coordinated programme can group suitable tasks, but access windows and operational dependencies still need to be checked for each building. Agree how additional findings will be reported and priced.
Applications across sectors
Sleeping accommodation raises different evacuation and access considerations from daytime offices. Education premises need work arranged around children and staff; warehouses need attention to storage and changes in layout. The actual use and fire arrangements govern the scope. Browse the full sector range and describe the actual building use when enquiring.
Frequently asked questions
Can a window be used instead of a failed AOV?
A substitution must be assessed against the designed system; ordinary opening windows do not automatically provide the required operation or performance.
What information should I send about smoke control and aov?
Supply the fire strategy, system drawings, cause-and-effect information, manuals and fault history. Include the location and the decision you need to make, such as investigating a fault, planning a repair or setting up a programme.
What affects the price and programme?
Natural or mechanical design, access height, control complexity, parts and occupied-area restrictions affect scope. Any further investigation or additional work should have a clear scope before it is authorised.
What should the completion information explain?
It should identify the equipment or areas covered, the work and checks performed, limitations and unresolved actions. Match the records to your site and asset references so the next inspection or maintenance visit can use them.