Black & White FacilitiesBuilt around your estateDiscuss requirements

service page

Fire Curtains and Fire Shutters

Failed deployment, damaged fabric or slats, obstructions and changes to alarm interfaces need investigation. Describe when the issue started and any change in use, operation or layout. A clear history helps distinguish a new fault from an existing limitation or a planned improvement.

Discuss your requirements

Defined services, clearly scoped.

Overview

For an estate instruction, list affected sites separately. One recurring symptom can have different causes on different installations, so retain the local history and restrictions.

What the work can include

Identify the assembly and controls; inspect visible components; assess deployment and reset functions; investigate faults; define compatible repair or replacement. The agreed scope should state which areas or equipment are included, what is excluded and the form of the completion record.

Use asset or location references that can be matched to your existing records. This makes the findings useful for budget decisions, repeat work and subsequent inspections.

Important decisions

A security shutter is not interchangeable with a fire shutter. The required protective function and supporting product information must be established.

Assessment and preparation

Provide product details, operating instructions, service reports and the alarm cause-and-effect information.

Name the site contact, technical approver and person who will receive the action list. Identify permit, shutdown and contractor coordination requirements before arranging attendance.

How the work proceeds

Arrange controlled deployment with affected areas clear, check agreed interfaces and record the final operating state and unresolved defects.

Where the work forms part of a wider programme, agree the order of sites and the route for escalating material findings. Keep partial completion visible rather than closing a whole site while actions remain open.

Cost, timing and disruption

Size, mounting height, control interfaces, component availability and the impact on trade or circulation affect cost. The enquiry and available records establish what can be priced directly and what needs a site assessment first.

A coordinated programme can group suitable tasks, but access windows and operational dependencies still need to be checked for each building. Agree how additional findings will be reported and priced.

Applications across sectors

Sleeping accommodation raises different evacuation and access considerations from daytime offices. Education premises need work arranged around children and staff; warehouses need attention to storage and changes in layout. The actual use and fire arrangements govern the scope. Browse the full sector range and describe the actual building use when enquiring.

Frequently asked questions

Can the opening remain in use during a deployment test?

The test needs a controlled area and agreed access arrangements because a descending curtain or shutter changes the route through the opening.

What information should I send about fire curtains and fire shutters?

Provide product details, operating instructions, service reports and the alarm cause-and-effect information. Include the location and the decision you need to make, such as investigating a fault, planning a repair or setting up a programme.

What affects the price and programme?

Size, mounting height, control interfaces, component availability and the impact on trade or circulation affect cost. Any further investigation or additional work should have a clear scope before it is authorised.

What should the completion information explain?

It should identify the equipment or areas covered, the work and checks performed, limitations and unresolved actions. Match the records to your site and asset references so the next inspection or maintenance visit can use them.

Your next step

Bring the estate
into clearer view.

Contact Black & White Facilities