service page
Passenger and Goods Lifts
A new building requirement, recurring faults or changing movement of people and goods can prompt assessment. Describe when the issue started and any change in use, operation or layout. A clear history helps distinguish a new fault from an existing limitation or a planned improvement.
Discuss your requirementsDefined services, clearly scoped.
Overview
For an estate instruction, list affected sites separately. One recurring symptom can have different causes on different installations, so retain the local history and restrictions.
What the work can include
Review lift type, capacity and use; assess relevant doors, controls and drive systems; scope servicing, repairs or replacement options. The agreed scope should state which areas or equipment are included, what is excluded and the form of the completion record.
Use asset or location references that can be matched to your existing records. This makes the findings useful for budget decisions, repeat work and subsequent inspections.
Important decisions
Passenger use, goods movement and combined use impose different requirements. Capacity alone does not establish that a lift is suitable for a proposed purpose.
Assessment and preparation
Provide make, model, rated use, service history and the users or loads that need to move.
Name the site contact, technical approver and person who will receive the action list. Identify permit, shutdown and contractor coordination requirements before arranging attendance.
How the work proceeds
Assess the installation and demand, define the right work route and coordinate lift, electrical and building interfaces.
Where the work forms part of a wider programme, agree the order of sites and the route for escalating material findings. Keep partial completion visible rather than closing a whole site while actions remain open.
Cost, timing and disruption
Travel distance, landings, capacity, shaft constraints and retained equipment affect cost. The enquiry and available records establish what can be priced directly and what needs a site assessment first.
A coordinated programme can group suitable tasks, but access windows and operational dependencies still need to be checked for each building. Agree how additional findings will be reported and priced.
Applications across sectors
Care and residential properties need to consider occupants who depend on lifts. Warehouses need equipment suited to goods movement and loading; public buildings need safe pedestrian routes while work is underway. The equipment’s intended use sets the boundary. Browse the full sector range and describe the actual building use when enquiring.
Frequently asked questions
Can a goods lift be used for passengers if it has enough capacity?
Not unless it is designed and authorised for that use. Load capacity does not determine passenger suitability.
What information should I send about passenger and goods lifts?
Provide make, model, rated use, service history and the users or loads that need to move. Include the location and the decision you need to make, such as investigating a fault, planning a repair or setting up a programme.
What affects the price and programme?
Travel distance, landings, capacity, shaft constraints and retained equipment affect cost. Any further investigation or additional work should have a clear scope before it is authorised.
What should the completion information explain?
It should identify the equipment or areas covered, the work and checks performed, limitations and unresolved actions. Match the records to your site and asset references so the next inspection or maintenance visit can use them.