How Should PPM Evidence Be Recorded?

Useful PPM evidence shows which asset was maintained, what was done, what was found and what remains outstanding.

Discuss your requirements

Maintenance is work organised over time.

What to check

  • asset reference and location.
  • scheduled task and completion date.
  • readings, tests or observations required by the task.
  • defects, recommendations and next due action.

Plan the next decision

Reject a generic completed status when the agreed task requires readings, findings or certification. Evidence should let another person understand the asset’s current status.

Define the person who can authorise work, the access conditions and the outcome required. Where the subject affects safety, security or compliance, use the competent assessment and premises-specific information required for that system.

Records and follow-up

01

Keep the instruction, findings, action taken, completion evidence and any open recommendation with its owner and due date.

Questions to ask

What information should I provide?

Give the property, exact asset or area, symptoms or trigger, previous findings and current restrictions. Include relevant drawings, manuals or reports where available.

Does this guide set a universal maintenance interval?

No. The applicable duty, risk assessment, system design, recognised guidance, manufacturer instructions and actual condition determine the property-specific requirement.

What should completion information show?

It should identify the work or assessment performed, findings, results, defects and outstanding action clearly enough for the responsible person to decide what happens next.

Source

See current official guidance. Apply it to the actual premises and recheck current requirements before relying on time-sensitive details.