knowledge article
What Is Hard Facilities Management?
Hard facilities management concerns the physical building and its technical systems. It brings the inspection, maintenance, repair and renewal of those assets into an organised service, with attention to their condition, use and effect on the property.
Discuss your requirementsAn operating system for the estate.
What falls within hard FM?
Common areas include electrical installations, heating, ventilation, plumbing, drainage, building fabric, roofing and other building systems. The actual appointment should identify the assets and activities included, together with specialist services and interfaces with retained contractors.
An asset list makes that scope concrete. 'Maintain the heating' is less useful than identifying the equipment, locations, service requirements, access arrangements and records available. The same principle applies to roofs, doors and other fabric elements that do not have a manufacturer's model number.
Three different kinds of work
Planned maintenance follows an established programme. Its tasks and intervals need the appropriate basis for the equipment or building element, including applicable requirements, manufacturer information and competent assessment.
Reactive work responds to a reported fault or defect. It should capture the findings and result so that repeat problems remain visible.
Renewal and improvement deal with changes that go beyond the original maintenance task. They need a defined project scope, budget and completion requirements rather than being hidden inside an unrelated work order.
Why the interfaces matter
A replacement item of plant can need electrical work, lifting or access arrangements, controls changes, commissioning and updates to the asset record. A roof repair can also involve water-damaged internal finishes. A hard FM plan should identify those connected activities before treating the main task as complete.
This is also why a list of certificates is not a complete maintenance picture. Inspection findings, recommendations, remedial actions and changes to equipment need to be connected to the relevant asset and decision-maker.
Information that improves the service
Start with asset and location references, previous reports, service history, known defects and operating constraints. Distinguish information verified at site from assumptions in an old register. Record what could not be inspected and why, so absence of a finding is not mistaken for a complete assessment.
Reporting should show overdue work, recurring faults and outstanding actions as well as completed tasks. That information supports decisions about investigation, repair and replacement.
Common questions
Is hard FM the same as a repair service?
Repairs are part of it. Hard FM also coordinates planned work, technical records and decisions across the building's assets.
Are all inspections carried out at the same interval?
No. The interval depends on the system and applicable requirements. An estate-wide calendar should retain the basis for each task rather than apply one frequency to everything.
Does hard FM include cleaning?
Routine cleaning is usually organised under soft FM. Cleaning required to complete a technical job still needs to be coordinated with that work.