Commercial Heating and Hot-Water Replacement at a Gateshead Veterinary Hospital

The hospital needed a replacement system capable of serving its radiator load and hot-water demand. Work had to be coordinated around a live clinical environment, with access and temporary service interruptions agreed with site staff.

Discuss your requirements

The work, documented.

Our approach

The existing boiler, cylinder and associated components were removed before the new installation was set out against the retained building services. Black & White Property Services installed an Ideal EnviroMax 2 60kW commercial boiler, an Ideal pre-plumbed commercial cylinder and a commercial MagnaClean filtration unit. New and modified pipework connected the equipment to the existing system.

The supporting work included a purpose-made plywood backboard, a commercial-grade equipment platform, colour coding of existing gas pipework and protective finishing around rough edges. Removed equipment and waste were taken away through the recorded waste route.

Work completed

  • Removed the former boiler, cylinder, associated pipework and components.
  • Installed the 60kW commercial boiler, commercial cylinder and filtration unit.
  • Adapted pipework and connections to suit the retained building services.
  • Built the equipment support and completed protective finishing.
  • Commissioned and functionally tested the installation.
  • Gave the site representative an operational overview.

Verified outcome

The completion report records the heating and hot-water system as operational following commissioning and functional testing. It also records the site handover. No performance saving or long-term efficiency improvement is claimed because the available evidence does not quantify one.

Project relationships

  • Responsible business: Black & White Property Services.
  • Sector: veterinary and clinical environments.
  • Project type: plant replacement and building-services upgrade.
  • Location: Gateshead area.
  • Relevant services: commercial heating, hot-water systems, pipework alterations and commissioning.
  • Display: both Black & White websites, with Black & White Property Services attributed as the delivering business.

Your next step

Bring the estate
into clearer view.

Contact Black & White Facilities